Seller shall submit a manufacturing and inspection control plan for Boeing's approval. As a minimum, the plan will delineate the sequence of manufacturing operations to be performed, the points within the manufacturing sequence where inspection is to be performed, the type of each inspection specified, and, if applicable, the specifications that define each inspection requirement. This plan will be submitted to Boeing's authorized purchasing representative. Approval by the Boeing's purchase representative is required prior to production of the goods. Boeing's approval of this plan does not relieve Seller of the responsibility to perform all inspections required by the applicable specifications. Any changes to the approved plan shall be submitted to Boeing for approval.
|